When I create a project, the estimated time should calculate based on the estimated times of my actions. Likewise, the estimated times of my actions should calculate based on the estimated times of my subactions. It is very strange to have to open manually every subaction to add up with a calculator how long the total action would take so that I can enter it in the action, and so on for a project.